Project for the setting up of the Adufe Bajo pumping station

Promotor: Empresa Metropolitana de Abastecimiento y Saneamiento de Aguas de Sevilla, S.A. (EMASESA)

his project entailed the construction of a new pumping station in Adufe Bajo (Alcalá de Guadaira) connected to the Carambolo-Seville system, to guarantee sufficient pumping capacity to handle the flow rate required to supply the eastern side of Seville plus the town of Alcalá de Guadaira, as the existing facilities were in very poor condition.

The new pumping station guarantees supplies in case of a malfunction. Two pump units were installed, to handle a flow rate of 350 l/s with a 35m water column.

No te pierdas ninguna novedad

Suscríbete a nuestro boletín