Extension of the Lepe drinking water treatment plant

Promotor: Environment & Water Agency

Construcciones Otero was selected to extend the drinking water treatment plant for the town of Lepe. The project consisted of the following:

  • Installing a 1200 l/s pre-ionisation facility.
  • 1200 l/s mixing chambers.
  • Construction of a new water line with a super-pulsator decanter, closed sand filters and active charcoal filtering for 1200 l/s.
  • Extended reagent dosing.
  • Replacement of the lime dosing system by caustic soda.
  • Sludge treatment: homogenising tank, gravity thickening, centrifuging and headwater recovery.